Deepwater Demo
Deep Water West-African Development.
Evaluation of alternative Development Scenarios
Synopsis: A consortium of Western oil companies is considering
a bid for acreage offshore Angola. Results from a feasibility study
suggests two development options: One alternative involves development
from a SPAR platform and the other includes production from two
separate subsea templates to a rental FPSO.
The objective of the first example is to demonstrate PlanVR's capabilities
as a tool for fast and accurate evaluation of competing scenarios.
Click
here
for a web based presentation or
here
to download a zipped version of the PowerPoint file.
Exploration Risk Demo
Exploration Risk.
Assessing the impact of exploration risk on the value of a prospect
area
Synopsis: In the prospecting stage the presence of hydrocarbons
in exploration opportunities is typically associated with a large
degree of uncertainty. Attaching a value to the prospects involves
both traditional volumetric assessments as well as an analysis of
the economic viability of extraction.
This example evaluates a license area containing 3 offshore prospects.
It uses PetroVRs capabilities to define chance of failure
and to define development alternatives as decisions embedded in
a project timeline.
Click
here
for a web based presentation or
here
to download a zipped version of the PowerPoint presentation.
Development Pace Demo
Development Pace Example
What is the Optimal Development Pace?
Synopsis: A company is evaluating an exploration project of two
fields, Odin and Thor. They expect that significant uncertainties
in Oil in Place will remain subsequent to exploration and appraisal.
Therefore, they plan to investigate two different development options.
In the first option named Blow and Go the company plan
to construct a large process facility and have 2 drilling rigs operate
concurrently to maximize the development pace.
The alternative Step by Step approach includes construction
of a small process facility and an upgrade when capacity is exceeded.
Only one drilling rig will be operating.
Click
here
for a web based presentation or
here
to download a zipped version of the PowerPoint presentation.
Composition Demo
Crude Quality Example
Impact of H2S on Project Economics.
Synopsis: Well tests and information from nearby fields indicate
that H2S production in a Devonian (Bravo) and Permian (Cleo) prospects
may increase significantly over time.
The oil company is concerned about the potential impact of project
economics as both processing costs and sales prices are linked to
the H2S content of the crude.
Click here
for a web based presentation or
here
to download a zipped version of the PowerPoint presentation.
Gas Contract Demo
Gas Contract Optimization.
Optimizing development to meet Gas Contract terms with PetroVR's
constraint system
Synopsis: PetroVRs constraint system allows the user to handle
very complex facility capacity and well scheduling issues.
This simple example demonstrates how the constraint system capabilities
can be used to automatically schedule drilling of wells and construction
of facilities to the point in time the production is required to
meet a contracted gas volume.
Click here
for a web based presentation or
here
to download a zipped version of the PowerPoint file.
Operations Management Demo
West Texas Field Operations Planning.
Creating a workover plan with PetroVR
Synopsis: PetroVR is most often used as an evaluation tool to create
models of future projects. This example demonstrates how PetroVR
also can be used to manage field operations in a producing field
with many wells. Field A has 50 wells and our task is
to generate a workover/recompletion schedule covering the next 7
years.
Click here
for a web based presentation or
here
to download a zipped version of the PowerPoint file.
|